Ralixar

Logistics execution

Optimisation

Route and Drayage Optimisation

A low headline rate can become an infeasible movement once cut-offs, equipment, service windows, port restrictions and drayage capacity are applied. Teams need comparable, constraint-valid options. Ralixar keeps model assistance behind confidence gates and authorised review.

GOVERNANCE

Confidence-gated intelligence

A recommendation is withheld when essential inputs are missing, no feasible plan exists or top options are too close under configured tolerances.

The problem

Disconnected evidence creates avoidable review work.

A low headline rate can become an infeasible movement once cut-offs, equipment, service windows, port restrictions and drayage capacity are applied. Teams need comparable, constraint-valid options.

Hard constraints

Safety and service eligibility cannot be relaxed

Governed workflow design

Trade-offs

Cost, transit, reliability and emissions stay visible

Governed workflow design

Human award

A planner approves the committed route and partner

Governed workflow design

The AI under the hood

A named technique behind an explicit control boundary.

The model has a bounded job. It does not own the workflow or decide what a person must do.

Optimisation

Technique in plain English

Constraint optimisation searches feasible combinations and scores trade-offs; it does not relax hard safety, regulatory or service rules.

Inputs

  • Cargo, equipment and handling needs
  • Rates, schedules and service validity
  • Port, terminal, CFS and drayage constraints
  • Pickup, delivery and cut-off windows

Confidence gate

A recommendation is withheld when essential inputs are missing, no feasible plan exists or top options are too close under configured tolerances.

Rules fallback

Rules-based route templates and manual comparison remain available; hard constraints are applied before any option is shown.

What the human decides

A planner chooses the route, carrier and transporter, accepts commercial trade-offs and authorises booking or dispatch.

Evidence and expected outcomes

Industry evidence, not invented product proof.

Each item states its source class and boundary. Ralixar is pre-launch; these figures do not claim customer outcomes.

Regulator data

Route constraints

The World Bank Logistics Performance Index treats infrastructure, shipment arrangements and timeliness as distinct logistics dimensions.

World Bank Logistics Performance Index
Regulator data

India network

PM GatiShakti frames multimodal infrastructure planning through integrated data.

DPIIT — PM GatiShakti

Modules involved

One workflow across a shared shipment record.

Each module works on the same evidence, event and decision history.

Related solutions

Continue through the same operating record.

Predictive ETA and Visibility

Reforecast the approved route from live events.

ML Prediction
Learn more

Container Load Planning

Align equipment selection with physical load constraints.

Optimisation
Learn more

Demurrage and Detention Prevention

Prioritise movements at risk of free-time exposure.

ML Prediction
Learn more

Review route and drayage optimisation on your own shipment flow.